Set `holder_commitment_point` to `Available` on upgrade
When we upgrade from LDK 0.0.123 or prior, we need to intialize
`holder_commitment_point` with commitment point(s). In
1f7f3a366c9e62cff5a5025724b5b508255a89d7 we changed the point(s)
which we fetch from both the current and next per-commitment-point
(setting the value to `HolderCommitmentPoint::Available` on
upgrade) to only fetching the current per-commitment-point (setting
the value to `HolderCommitmentPoint::PendingNext` on upgrade).
In `commitment_signed` handling, we expect the next
per-commitment-point to be available (allowing us to `advance()`
the `holder_commitment_point`), as it was included in the
`revoke_and_ack` we most recently sent to our peer, so must've been
available at that time.
Sadly, these two interact negatively with each other - on upgrade,
assuming the channel is at a steady state and there are no pending
updates, we'll not make the next per-commitment-point available but
if we receive a `commitment_signed` from our peer we'll assume it
is. As a result, in debug mode, we'll hit an assertion failure, and
in production mode we'll force-close the channel.
Instead, here, we fix the upgrade logic to always upgrade directly
to `HolderCommitmentPoint::Available`, making the next
per-commitment-point available immediately.
We also attempt to resolve the next per-commitment-point in
`get_channel_reestablish`, allowing any channels which were
upgraded to LDK 0.0.124 and are in this broken state to avoid the
force-closure, as long as they don't receive a `commitment_signed`
in the interim.